WELL CONTROL SYSTEMS
sold out
WELL CONTROL SYSTEMS
$0.00
Overview of Subsea BOP control system operating philosophy; diagnosing and correcting system hydraulic, pneumatic and electrical faults; and also features a section on MUX systems.
LENGTH: 40 Hrs (5 Days)